CINCINNATI BASED. PROJECT FOCUSED.Scott Mann · 859-466-7801

Ohio geotechnical / Slopes and excavation

Plan the geotechnical conversation for an Ohio hillside site

On a sloping or constrained site, explain the proposed change before asking for a geotechnical proposal. An addition, new grade, excavation, or retaining structure can raise different questions. A clear brief helps the team identify which investigation and design services to discuss.

Civil Solutions Associates, Inc. · Project planning

01 / Planning the work

Locate the work and establish the design stage

Send the Ohio property location, available survey, and a concept plan showing the proposed work. Describe the intended development and any grading, retaining, or excavation features under consideration. Identify the reviewing jurisdiction and share correspondence already received from the city or project reviewers.

For sites in Cincinnati, ask the project team whether Hillside Overlay District requirements apply. The city's preliminary geotechnical evaluation handout distinguishes the preliminary submission from the more detailed geotechnical report discussed for building permitting. Confirm the applicable process with the city and responsible professionals.

02 / Planning the work

Describe existing conditions without diagnosing them

Collect available records for existing retaining structures, earlier grading, drainage arrangements, and previous investigations. Provide dated photographs with their locations marked on a plan. If the owner has observed a change, describe what was seen and when; let the qualified team assess its significance.

ODNR's generalized bedrock map is a regional reference your team can consult alongside those records. It doesn't determine a property's stability, foundation recommendation, or excavation support design. Those conclusions need a project-specific professional evaluation and appropriate supporting information.

03 / Planning the work

Bring the excavation and permanent design together

Identify nearby buildings, roads, utilities, boundaries, and access restrictions that the team should consider. Include proposed levels and any available structural loads from the designers. Flag areas where access or offsite coordination remains unresolved so those constraints can be considered when scoping the work.

CSA's capabilities include slope stability analysis and stabilization design, foundation recommendations, earth retention, and excavation support. Ask which services and design inputs the proposed project needs. Have the qualified team establish the technical scope rather than selecting a wall or foundation approach from a photograph.

04 / Planning the work

Plan the decisions after the investigation

Identify the architect, civil engineer, structural engineer, and owner contacts who'll use the findings. Discuss how the recommendations will be incorporated into the design, who coordinates questions, and how revised grading or excavation limits will be reviewed.

Ask about construction-phase geotechnical support and how observed conditions will be communicated during the work. Provide the actual design and construction milestones so the proposed deliverables fit those decisions. Scott can connect the initial brief with CSA's engineering team for scope review.

References for your project

Use the project’s adopted documents and the responsible agency’s requirements when defining the scope.

Put the information to work

Talk through your project with Scott.

Scott Mann · Director of Business Development

Discuss your project 859-466-7801